Weizhen Small Motor Assembly Line
為(wèi)客戶量身定做(zuò)各種專用繞線和(hé)智能化設備,提供包括線圈骨架的改良、插針、繞線、包膠、焊接、測試、沖壓和(hé)成品組裝等自動化生(shēng)産線方案。以服務客戶滿足客戶需求為(wèi)目标,不斷提供國內(nèi)少(shǎo)有(yǒu)的高(gāo)性價比繞線和(hé)專業自動化智能設備。
所屬分類:
關鍵詞:
全自動繞線機
立即留言
産品詳情
Weizhen Micro Motor Component Assembly Automatic Line Technical Agreement
Party A: Shenzhen Weizhen Motor Co., Ltd. Contract No.: OZMA2013081531
Party B: Hangzhou Osma CNC Equipment Co., Ltd
This technical agreement is an attachment to the purchase and sales contract numbered OZMA2013081531, and has the same legal effect as it. The purpose is to specify the technical requirements for the supply and acceptance of the equipment, and other related matters, for both parties to implement.
1、 The second party shall provide a reference BOM list for the production line, and the plan shall refer to Attachment 1
Reference to BOM List for Assembly Automatic Line of Weizhen Micro Motor Components |
||||
order number |
Project Content |
brand |
quantity |
remarks |
一、 |
Brush holder feeding conveyor belt and rotor feeding conveyor belt |
|||
1 |
Accompanying block |
OZMA |
20 |
|
2 |
Aluminum profile double circuit wire body |
China |
8M |
Including belt conveyor and reducer |
3 |
Pneumatic components |
SMC |
a certain number or amount |
|
4 |
Sensor |
Omron |
a certain number or amount |
|
二 |
Install gasket and oil dispenser |
OZMA |
1 |
|
1 |
Chassis |
OZMA |
1 |
|
2 |
Fixture |
OZMA |
1 |
|
3 |
Vibration feeding tray |
Taiwan |
1 |
|
4 |
Pneumatic components |
SMC |
a certain number or amount |
|
5 |
Sensor |
Omron |
a certain number or amount |
|
三 |
Turntable assembly machine |
|||
1 |
chassis |
OZMA |
1 |
|
2 |
Box turntable |
OZMA |
1 |
|
3 |
Accompanying fixture |
OZMA |
8 |
|
4 |
Shim vibration disc |
Taiwan |
1 |
|
5 |
Rear end cover vibration plate |
Taiwan |
1 |
|
6 |
Pressure machine (gas-liquid booster cylinder) |
OZMA |
1 |
|
7 |
2D robotic arm |
OZMA |
2 |
|
8 |
DD motor |
CKD |
1 |
|
9 |
Stator feeding assembly line |
OZMA |
1 |
|
10 |
Protection cover |
OZMA |
2 |
|
11 |
Pneumatic components |
SMC |
a certain number or amount |
|
12 |
Sensor |
Omron |
a certain number or amount |
|
四 |
Axial clearance detection machine |
|||
1 |
chassis |
OZMA |
1 |
|
2 |
box |
OZMA |
1 |
|
3 |
fixture |
OZMA |
1 |
|
4 |
Pneumatic components |
SMC |
a certain number or amount |
|
5 |
sensor |
Omron |
a certain number or amount |
|
五 |
Knurling machine |
Outsourcing |
1 |
Mutual agreement |
六 |
Installation of protective magnetic coil machine |
|||
1 |
chassis |
OZMA |
1 |
|
2 |
fixture |
OZMA |
|
|
3 |
Vibration feeding tray |
Taiwan |
|
|
4 |
Pneumatic components |
SMC |
a certain number or amount |
|
5 |
sensor |
Omron |
a certain number or amount |
|
七 |
Finished product conveying line |
|||
1 |
Aluminum profile single circuit wire body |
China |
5M |
Including belt conveyor and reducer |
八 |
Six degrees of freedom robot |
Mitsubishi |
2 |
|
1 |
Robot rack |
OZMA |
2 |
|
2 |
fixture |
OZMA |
2 |
|
3 |
Pneumatic components |
SMC |
a certain number or amount |
|
4 |
sensor |
Omron |
a certain number or amount |
|
九 |
navar |
Mitsubishi |
1 |
|
|
touch screen |
Taiwan |
1 |
|
|
sensor |
Omron |
a certain number or amount |
|
|
Other electrical components |
|
a certain number or amount |
|
十 |
Safety cover (including safety grating) |
China |
1 |
|
2、 Delivery and acceptance
1.Delivery. Representatives from both parties shall be sent to the factory of Party A for joint unpacking inspection. If it is found that the equipment's factory certificate or equipment model and specifications do not match the contract, or if the spare parts are incomplete or inconsistent, Party A has the right to request Party B to replace them with new goods or make up for them, and Party B shall be responsible for any losses caused thereby.
2. Equipment installation, debugging, and acceptance.
1) After the equipment arrives at the factory, Party A shall complete the preparation work for equipment installation and debugging according to the requirements of the technical documents, and then notify Party B to send engineering and technical personnel to carry out equipment debugging. Within 5 working days after receiving the notice from Party A, Party B shall arrive at the acceptance site and bear all expenses incurred by Party A for on-site inspection.
2) After the equipment debugging is completed, the relevant engineering and technical personnel of Party B shall provide training on operation, maintenance, repair, and other matters to the technical and operational personnel of Party A.
3) After the installation and debugging are qualified, both Party A and Party B shall jointly sign the acceptance report.
3.Attachment: The second party shall provide the following technical information to the first party: the complete set of equipment operation and maintenance instructions, and other materials.
三:after-sale service
1.The warranty period of the equipment is one year, and within one year from the signing of the equipment acceptance report, any damage caused during normal use or malfunction shall be repaired by Party B free of charge.
2.After receiving the fault notification from Party A, Party B shall respond within 2 hours. If the problem cannot be solved through telephone communication, Party B shall arrive at the site within 24 hours to solve the problem, in order to reduce Party A's losses.
3.The expenses incurred beyond the warranty period shall be determined through consultation between both parties.
四.Other matters not covered shall be resolved through separate negotiations between both parties.
五.This technical agreement is made in duplicate, with each party holding one copy. It shall come into effect after being signed and stamped.
Party A: Shenzhen Weizhen Motor Co., Ltd. Party B: Hangzhou Osma CNC Equipment Co., Ltd
Signature and seal: Signature and seal:
Date: Date:
ONLINE MESSAGE
在線留言
*注:請(qǐng)務必信息填寫準确,并保持通(tōng)訊暢通(tōng),我們會(huì)盡快與你(nǐ)取得(de)聯系